New or relocated machinery
Send model details, layout, supplier instructions and your handover requirements. Identify whether you need sourcing, commissioning or a separate geometry assessment. Agree who will prepare the site and approve the results.
Planned maintenance or stoppage
Share service history, production impact and the available work window. For an urgent fault, include the first alarm and the activity at the time. For recurring service, identify covered assets and ask how additional work is approved.
Equipment and personnel
Separate fleet, operator and crew requirements in your brief. Share intended shifts, access restrictions and the work sequence so you can assess whether the proposed equipment and personnel can mobilise together.
Review the complete quotation
Confirm what the scope covers, what your site will provide, who approves changes and how completion will be recorded. If you already know the machine or equipment type you need, use the Products catalog to prepare the technical details.
Choose support by the state of your operation
If a machine has stopped unexpectedly, start with the breakdown guide. Record the alarm, operating context and production impact before you speak with the service team. If the machine is still running and the problem appears periodically, the repair and preventive maintenance guide will help you describe both the symptom and an appropriate visit window. Where the output is dimensionally inconsistent, share the inspection records and review the calibration and alignment guide. It explains what to include when asking for a geometry assessment.
When a project involves new machinery, decide which stages are already covered by the supplier. A supply enquiry can include machine selection, delivery and installation scope. A commissioning enquiry is more focused on preparing a specific machine and agreeing how it will be handed over to production. If equipment has been moved or reconditioned, include its history and documentation so the technical team can consider those changes when reviewing the request.
Build a brief for recurring work
For a fleet maintenance contract, put the asset register and service schedule together before comparing coverage. Identify equipment that moves between sites and who can release it for planned work. If the need is temporary plant or transport, list the equipment duty by site and distinguish delivery dates from operating dates. Where the project needs both equipment and people, assign a contact for each requirement and show the dates when the two need to be available together.
A workforce request should show what the crew will do as well as how many people the project needs. Name the trades, their work areas, shift patterns and the supervisors who will assign tasks. Where installation, welding or other work depends on approvals, state what the project team needs to review before mobilisation. If the programme changes, a dated role schedule makes it easier to identify which parts of the enquiry need to be updated.
Send the information needed to start
A first enquiry can be brief. Give ATJ the site location, your planned dates, a contact who knows the work and the result you want to achieve. For a replacement part, add the machine serial number and component reference. For a site visit, explain when the equipment can be made available. Where several work packages are involved, send a short list with the sequence and the decisions that are still open. Confirm final availability and the agreed scope directly with ATJ before scheduling the work.